PB Paving & Landscaping interlock work in Eastern Ontario
INTERLOCKING STONE • DRIVEWAYS, WALKWAYS, STEPS, BORDERS

Interlock That Holds Its Line.

Interlock driveways, walkways, steps, patios and borders across Rockland, Prescott-Russell and Ottawa. Base, drainage, edge restraint and pattern are planned together so the finished work holds its lines and sits naturally within the property.

The finish depends on what supports and contains it. Base, edge restraint and drainage are established before the pattern is set.

SCOPE OF WORK

What Interlock Work Covers

Interlock Driveways

Full driveways and aprons in paver or slab formats, on a base built for vehicle load.

Walkways & Entrances

Front walks, side paths and entrance landings that line up with the door, the driveway and the grade.

Steps & Landings

Stone steps and risers set to consistent heights, tied into the walkway and the wall.

Patios & Terraces

Backyard patios and terraces built for furniture and foot traffic, graded to drain away from the house.

Borders & Edging

Interlock or stone borders along asphalt driveways and planting beds, with edge restraint to hold the finished line.

Lifting & Relaying

Sunken or heaved sections lifted, the base corrected and the same stone relaid so the repair matches.

HOW IT IS BUILT
Structure

Base & Bedding

Granular base is compacted in lifts to the depth required by the application, followed by a controlled bedding course that establishes the finished plane.

Base Control
Compacted in Lifts
PROJECT FACTORS

What Shapes a Lasting Interlock Installation

Base depth follows the use: a walkway and a driveway are not built on the same section.

Edge restraint keeps the paved area contained and preserves the geometry of the installation over time.

Jointing, grade and surface geometry work together to manage water and support a stable installation.

Stone, scale and pattern are selected around the architecture of the property and the surrounding materials.

QUESTIONS

Questions About Interlock

Cost depends on area, material selection, pattern, edge treatment and the preparation required below the surface. The site is reviewed before a project scope and price are established.

With a sound base and appropriate care, interlock can perform for decades. Its lasting stability depends on the base, drainage and edge restraint beneath and around the finished surface.

Yes. Sections are lifted, the base is corrected and the same stone is relaid, so the repair matches the rest.

Installation typically runs from spring thaw until the ground freezes. Winter allows time to plan material, layout and scope ahead of the construction season.

WHERE THIS WORK IS DONE
PROJECT INTAKE

Discuss an Interlock Project

Interlock driveways, walkways, steps, patios and borders across Rockland, Prescott-Russell and Ottawa. Base, elevations, edges and pattern are reviewed as one complete installation.

Discuss an Interlock Project