PB Paving & Landscaping retaining walls work in Eastern Ontario
RETAINING WALLS • ARMOUR STONE, BLOCK, TIMBER

Walls That Hold. Levels That Stay.

Armour stone, interlocking block and timber retaining walls across Rockland, Prescott-Russell and Ottawa. The base, wall system and drainage are planned around the retained grade, with the finished line tied into the surrounding property.

The wall, the retained grade and the water behind it are one system. Each is considered together.

SCOPE OF WORK

What Retaining Wall Work Covers

Armour Stone

Large quarried stone set by machine for substantial walls and defined changes in grade.

Interlocking Block

Segmental block systems for clean lines, curves and steps, with finishes selected to suit the property.

Timber Walls

Timber treated for exterior use, suited to low walls, garden transitions and simpler terraced conditions.

Terracing & Steps

Slopes broken into level terraces with steps and landings tied into the walls.

Wall Replacement

Leaning, settled or deteriorated walls removed, underlying conditions corrected and the wall rebuilt to a consistent line.

Walls with Driveways

Walls beside driveways and along their edges, coordinated with the paving so grades and transitions align.

HOW IT IS BUILT
Foundation

Footing & Base

Granular footing is established on suitable material, levelled and prepared to support the wall system and the load it carries.

Base Control
Prepared for the Load
PROJECT FACTORS

What Shapes a Wall That Holds Its Line

Wall height, retained load and site conditions determine the wall system and whether engineering or permitting is required.

Drainage is integrated into the wall assembly to manage water behind the structure and reduce pressure.

The footing is established on suitable ground and prepared around the load the wall is expected to retain.

Material selection follows the scale, character and expected service life of the finished property.

QUESTIONS

Questions About Retaining Walls

Retaining wall cost depends on wall system, height, retained load, drainage requirements and site access. The site is reviewed before the appropriate system and project price are established.

Yes. Drainage is part of the wall system. Clear stone, filter fabric and drainage components provide a controlled path for water behind the structure.

Requirements depend on the wall height, location, retained load and local rules. Walls supporting a driveway or structure may need engineering and a permit. These requirements are reviewed before the project scope is confirmed.

Possibly. The existing wall, footing and drainage are reviewed to determine whether localized reconstruction or full replacement is appropriate.

WHERE THIS WORK IS DONE
PROJECT INTAKE

Discuss a Retaining Wall Project

Armour stone, block and timber walls across Rockland, Prescott-Russell and Ottawa. Height, retained load, drainage, access and surrounding grades are reviewed together.

Discuss a Retaining Wall Project